Welsh Government documents within the Construction Information Service
- Implementation of Schedule 3 to the Flood and Water Management Act 2010 for mandatory sustainable drainage systems (SuDS) on new developments. (Draft) frequently asked questions. Guidance for local authorities, developers, and statutory and non-statutory consultees
- Implications for technical advice note 1 resulting from recent amendments to the use classes order
- Increasing flood risk and the responsibilities of members in the planning system
- Increasing the delivery of affordable homes
- Increasing the standard daily amount charged by the Planning Inspectorate for holding inquiries into local development plans and other rechargeable work
- Independent review of affordable housing supply
- Industry: sector emission pathway
- Infrastructure for electronic communications. Volume 1: physical infrastructure and network connection for new dwellings (2025 edition) (For use in Wales) (Applicable from 1 July 2025)
- Infrastructure for electronic communications. Volume 2: physical infrastructure for high-speed electronic communications networks (2025 edition) (For use in Wales) (Applicable from 1 July 2025)
- Insurance schemes for approved inspectors pursuant to section 47 (6) of the Building Act 1984
- Interim report of building regulations and fire safety, building a safer future
- Introduction of the Construction Products Regulation (EU) 305/2011
- Investigation procedure statement: regulation of the building control profession (local authorities)
- Land use, land use change and forestry: sector emission pathway
- Landscape and visual effects assessment (Wales only)
- Lerwick District Heating
- Letter from the Cabinet Secretary for Environment and Rural Affairs regarding the delivery of affordable homes through the planning system
- Letter regarding Welsh government approach to shale gas applications
- Limiting large scale wind farms to seven areas
- Lion House
- Llwybr Newydd. The Wales transport strategy 2021
- Local and shared ownership of energy projects in Wales
- Local authority household projections (2014-based)
- Local authority household projections for Wales: 2018-based (revised)
- Local authority population projections for Wales (2014-based): principal projection
- Local authority population projections for Wales (2014-based): variant projections
- Local authority population projections for Wales: 2018-based (revised)
- Local authority powers to manage houses in multiple occupation (HMOs)
- Local development orders - impacts and good practice: final report
- Local development plan (LDP) preparation - novel Coronavirus (COVID-19)
- Local development plan examinations: procedure guidance
- Local development plans - important guidance on procedure for advertising focussed changes to the deposit LDP
- Local development plans: alternative sites
- Local flood risk management strategies - local strategy: November 2011
- Local places for nature evaluation 2021-22
- Longitudinal viability study of the planning process - final report
- Low carbon energy generation in Wales - baseline study of renewable energy
- Low carbon energy generation in Wales - updated study of low carbon energy
- Managing gypsy and traveller sites in Wales - guidance
- Marine energy infrastructure study. Stage A - industry consultation and concept design
- Marine energy infrastructure study. Stage B - final report
- Meeting the housing challenge - building a consensus for action
- Mendip Place
- Mobile action plan
- Mobile infrastructure project: information for planning services
- Model enforcement warning notice - annex 6
- Monitoring the national transport plan, update 2011
- Monitoring the national transport plan, update 2012
- Monitoring the regional transport plans, baseline report, 2011
- National approach for road and street works in Wales
- National Calculation Methodology (NCM) modelling guide (for buildings other than dwellings in Wales). 2022 edition
- National landscapes - realising their potential: the review of designated landscapes in Wales. Final report
- National minimum standards for regulated child care for children up to the age of 12 years
- National park household projections (2014-based)
- National park household projections for Wales: 2018-based
- National parks population projections for Wales: 2018-based
- National planning policy - Wales. BREEAM 2011 technical analysis: research summary
- National strategy for flood and coastal erosion risk management in Wales
- National transport delivery plan 2022 to 2027
- National transport finance plan 2018 update
- Natural resource management case studies
- Natural resources policy
- Nearly zero energy buildings
- Nearly zero energy buildings
- Net zero strategic plan
- Net zero Wales. Carbon budget 2 (2021-25)
- Netting of trees and hedgerows
- New Approved Document R/part 9A - physical infrastructure for high speed electronic communications networks
- New commencement and consequential regulations supporting the Building Safety Act 2022
- New criteria for Approved Inspector insurance
- New development management procedures
- New house building in Wales, 2015-16
- New house building in Wales, 2016-17 (revised)
- New house building in Wales, 2017-18
- New house building in Wales, 2018-19
- New house building in Wales, 2019-20 and 2020-21
- New house building in Wales, 2021-22
- New house building: April 2022 to March 2023
- New house building: April 2023 to March 2024
- New house building: April 2023 to March 2024
- New regulations implementing the Building Safety Act 2022: description of higher-risk buildings; charges; registration, sanctions and appeals
- New regulations supporting the Building Safety Act 2022: restricted activities and functions and amendments to the Building (Approved Inspectors etc.) Regulations 2010
- New requirements for the building control profession in Wales
- Noise and soundscape action plan 2018-2023
- Noise and soundscape plan for Wales. Our national strategy on soundscapes. 2023-2028
- Notice of approval of the methodologies of calculation of the energy performance of buildings to demonstrate compliance with the Building Regulations 2010 in Wales
- Notice of approval of the methodologies of calculation of the energy performance of buildings to demonstrate compliance with the Building Regulations 2010, and regulation 7A of the Energy Performance of Buildings (England and Wales) Regulations 2012 in Wales
- Notice of approval of updated calculation methodologies for Wales
- Notice of closure of air pressure testing scheme
- Notification direction guidance. Town and Country Planning (Notification) (Coal and Petroleum) (Wales) Direction 2018
- One planet development - technical advice note 6: planning for sustainable rural communities
- Online aviation safeguarding toolkit
- Operational standards rules (Wales) 2024 version 2
- Operational standards rules: monitoring arrangements (Wales)
- Overheating (For use in Wales)
- Palestra Building Retrofit
- Part IV of the Environment Act 1995. Local air quality management in Wales. Policy guidance PG(W)(17) - June 2017
- People and licensing and vehicle ownership - 2012
- Permitted development for householders - technical guidance. Version 2
- Permitted development rights