Welsh Government documents within the Construction Information Service
- Housing hazards and licences, 2014-15
- Housing hazards and licences, 2015-16
- Housing hazards and licences, 2016-17
- Housing hazards and licences, 2018-19
- Housing hazards and licences, 2020-21
- Housing hazards: April 2022 to March 2023
- Housing hazards: April 2023 to March 2024
- Housing in Wales (Census 2021)
- Housing land availability in Wales - summary for 2012
- Housing land availability in Wales - summary for 2015
- Housing land availability in Wales - summary for 2016
- Housing land availability in Wales - summary for 2017
- Housing land availability in Wales - summary for 2018
- How resilient are buildings in the UK and Wales to the challenges associated with a changing climate? Practical recommendations for risk-based adaptation
- Implementation of Schedule 3 to the Flood and Water Management Act 2010 for mandatory sustainable drainage systems (SuDS) on new developments. (Draft) frequently asked questions. Guidance for local authorities, developers, and statutory and non-statutory consultees
- Implications for technical advice note 1 resulting from recent amendments to the use classes order
- Increasing flood risk and the responsibilities of members in the planning system
- Increasing the delivery of affordable homes
- Increasing the standard daily amount charged by the Planning Inspectorate for holding inquiries into local development plans and other rechargeable work
- Independent review of affordable housing supply
- Industry: sector emission pathway
- Infrastructure for electronic communications. Volume 1: physical infrastructure and network connection for new dwellings (2025 edition) (For use in Wales)
- Infrastructure for electronic communications. Volume 2: physical infrastructure for high-speed electronic communications networks (2025 edition) (For use in Wales)
- Insurance schemes for approved inspectors pursuant to section 47 (6) of the Building Act 1984
- Interim planning policy statement on development in SAC rivers and reminder of restrictions on permitted development rights in SAC rivers
- Interim report of building regulations and fire safety, building a safer future
- Introduction of the Construction Products Regulation (EU) 305/2011
- Investigation procedure statement: regulation of the building control profession (local authorities)
- Land use, land use change and forestry: sector emission pathway
- Landscape and visual effects assessment (Wales only)
- Lerwick District Heating
- Letter from the Cabinet Secretary for Environment and Rural Affairs regarding the delivery of affordable homes through the planning system
- Letter regarding Welsh government approach to shale gas applications
- Limiting large scale wind farms to seven areas
- Lion House
- Llwybr Newydd. The Wales transport strategy 2021
- Local air environment. Local air quality and soundscapes management in Wales 2025. Policy guidance PG(W)(25)
- Local and shared ownership of energy projects in Wales
- Local authority household projections (2014-based)
- Local authority household projections for Wales: 2018-based (revised)
- Local authority population projections for Wales (2014-based): principal projection
- Local authority population projections for Wales (2014-based): variant projections
- Local authority population projections for Wales: 2018-based (revised)
- Local authority powers to manage houses in multiple occupation (HMOs)
- Local development orders - impacts and good practice: final report
- Local development plan (LDP) preparation - novel Coronavirus (COVID-19)
- Local development plan examinations: guidance for programme officers
- Local development plan examinations: procedure guidance
- Local development plans - important guidance on procedure for advertising focussed changes to the deposit LDP
- Local development plans: alternative sites
- Local flood risk management strategies - local strategy: November 2011
- Local places for nature evaluation 2021-22
- Longitudinal viability study of the planning process - final report
- Low carbon energy generation in Wales - baseline study of renewable energy
- Low carbon energy generation in Wales - updated study of low carbon energy
- Managing gypsy and traveller sites in Wales - guidance
- Marine energy infrastructure study. Stage A - industry consultation and concept design
- Marine energy infrastructure study. Stage B - final report
- Meeting the housing challenge - building a consensus for action
- Mendip Place
- Mobile action plan
- Mobile infrastructure project: information for planning services
- Model enforcement warning notice - annex 6
- Monitoring the national transport plan, update 2011
- Monitoring the national transport plan, update 2012
- Monitoring the regional transport plans, baseline report, 2011
- National approach for road and street works in Wales
- National Calculation Methodology (NCM) modelling guide (for buildings other than dwellings in Wales). 2022 edition
- National landscapes - realising their potential: the review of designated landscapes in Wales. Final report
- National minimum standards for regulated child care for children up to the age of 12 years
- National park household projections (2014-based)
- National park household projections for Wales: 2018-based
- National parks population projections for Wales: 2018-based
- National planning policy - Wales. BREEAM 2011 technical analysis: research summary
- National strategy for flood and coastal erosion risk management in Wales
- National transport delivery plan 2022 to 2027
- National transport finance plan 2018 update
- Natural resource management case studies
- Natural resources policy
- Nearly zero energy buildings
- Nearly zero energy buildings
- Net zero strategic plan
- Net zero Wales. Carbon budget 2 (2021-25)
- Netting of trees and hedgerows
- New Approved Document R/part 9A - physical infrastructure for high speed electronic communications networks
- New commencement and consequential regulations supporting the Building Safety Act 2022
- New criteria for Approved Inspector insurance
- New development management procedures
- New house building in Wales, 2015-16
- New house building in Wales, 2016-17 (revised)
- New house building in Wales, 2017-18
- New house building in Wales, 2018-19
- New house building in Wales, 2019-20 and 2020-21
- New house building in Wales, 2021-22
- New house building: April 2022 to March 2023
- New house building: April 2023 to March 2024
- New house building: April 2023 to March 2024
- New regulations implementing the Building Safety Act 2022: description of higher-risk buildings; charges; registration, sanctions and appeals
- New regulations supporting the Building Safety Act 2022: restricted activities and functions and amendments to the Building (Approved Inspectors etc.) Regulations 2010
- New requirements for the building control profession in Wales