Current
Civil & Structural Supplement
Technical Guide
Provides technical guidance for the design and installation of temporary works in concrete bridge construction, including the interaction with permanent works. Covers responsibilities, technical approval, concrete bridge substructures, in-situ deck, precast beam and in-situ slab deck, precast concrete box girder deck, incremental launched deck, cable stayed and extrados decks and offline construction.
TG16.
9781999757823
The Concrete Bridge Development Group is an association of member companies and organisations, dedicated to the task of improving efficiency of the design, construction and maintenance of concrete bridges. They publish a range of technical guides, papers and current practice sheets based on research and group activities.
NBS has produced specification systems and information products for construction industry professionals for more than 40 years. The National Building Specification is the recognised UK national standard and is used by over 5,000 organisations. NBS is part of RIBA Enterprises Ltd.
We connect trusted knowledge to customers' workflows – mitigating risk, increasing efficiency and accelerating innovation For more than 60 years, leading R&D and engineering-intensive organizations have relied on us to achieve on-time, on-budget delivery of complex projects and new products. We deliver an unparalleled combination of technical content and Artificial Intelligence (AI) technologies to surface answers from the vast universe of technical knowledge, both inside and outside the organization. In a single interface, we connect the dots between information scattered across many different sources, allowing technical professionals to make better, more informed decisions faster.