Explores the complex role of the lead designer at the different stages of the 2013 Plan of Work. Focuses in particular on the introduction of Stages 0 and 7 which require information to be produced for operational/asset management purposes where once was just for construction, and the three core design stages which can present many challenges.
Sinclair, D.
Although there is now a RIBA Plan of Work 2020, this document can be used as the stage structure in the RIBA Plan of Work 2020 is unchanged and this guidance covers specific detail on themes or strategies in a project.
9781859465509
RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.
NBS has produced specification systems and information products for construction industry professionals for more than 40 years. The National Building Specification is the recognised UK national standard and is used by over 5,000 organisations. NBS is part of RIBA Enterprises Ltd.
We connect trusted knowledge to customers' workflows – mitigating risk, increasing efficiency and accelerating innovation For more than 60 years, leading R&D and engineering-intensive organizations have relied on us to achieve on-time, on-budget delivery of complex projects and new products. We deliver an unparalleled combination of technical content and Artificial Intelligence (AI) technologies to surface answers from the vast universe of technical knowledge, both inside and outside the organization. In a single interface, we connect the dots between information scattered across many different sources, allowing technical professionals to make better, more informed decisions faster.