Withdrawn
Core Supplement
Provides updated guidance for the planning, design and construction of foul and surface water gravity sewers, lateral drains, pumping stations and rising mains to adoptable standards. The 2011 changes implemented a transfer of responsibility to water and sewerage companies for sewers connected to the public sewer system in England and Wales. Also provides the industry recommendations, civil engineering specification and the specification for pumping stations.
Superseded by 2019 version, which was then updated in 2020. Replaces 6th edition (including interim technical addendum no.1). 7th edition - August 2012. Updated: 10/02/2014 - Corrigendum for pages: 2, 19, 20, 29, 30, 34, 35, 39, 91, 96, 106, 110 and 113. Published by WRc plc on behalf of Water UK.
9781898920656
The Water Research Centre provides consultancy and research in the water, waste and environment sectors.
NBS has produced specification systems and information products for construction industry professionals for more than 40 years. The National Building Specification is the recognised UK national standard and is used by over 5,000 organisations. NBS is part of RIBA Enterprises Ltd.
We connect trusted knowledge to customers' workflows – mitigating risk, increasing efficiency and accelerating innovation For more than 60 years, leading R&D and engineering-intensive organizations have relied on us to achieve on-time, on-budget delivery of complex projects and new products. We deliver an unparalleled combination of technical content and Artificial Intelligence (AI) technologies to surface answers from the vast universe of technical knowledge, both inside and outside the organization. In a single interface, we connect the dots between information scattered across many different sources, allowing technical professionals to make better, more informed decisions faster.