Withdrawn
Core Supplement
JCT Measured Term Contract (MTC)
Appropriate for use by employers who have a regular flow of maintenance and minor works, including improvements, to be carried out by a single contractor where the work is to be instructed from time to time and measured and valued on the basis of an agreed schedule of rates, and where a contract administrator is to administer the conditions.
Replaced by MTC 2016 JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. Replaces - MTC 05. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT measured term contract 2011 (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
9780414047068
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
NBS has produced specification systems and information products for construction industry professionals for more than 40 years. The National Building Specification is the recognised UK national standard and is used by over 5,000 organisations. NBS is part of RIBA Enterprises Ltd.
We connect trusted knowledge to customers' workflows – mitigating risk, increasing efficiency and accelerating innovation For more than 60 years, leading R&D and engineering-intensive organizations have relied on us to achieve on-time, on-budget delivery of complex projects and new products. We deliver an unparalleled combination of technical content and Artificial Intelligence (AI) technologies to surface answers from the vast universe of technical knowledge, both inside and outside the organization. In a single interface, we connect the dots between information scattered across many different sources, allowing technical professionals to make better, more informed decisions faster.