Document Status
Withdrawn
Supplement
Core Supplement
Series
JCT Major Project Contract (MP)
Abstract
Appropriate for use where the main contract is the Major Project Construction Contract, and for sub-contract works whether or not they include design by the sub-contractor. Can be used where the sub-contract works and/or main contract works are to be carried out in sections, for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement of the sub-contract works.
History
Current edition: MPSub 2016. Previous editions: MPSub 05 (Revision 2 2009), Sub/MPF 2004. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT major project sub-contract 2011 (SMA, 2015), which has been included as a separate document. MPSub 2011. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
ISBN
9780414047020
Subjects
- Contracts
- JCT Contracts
- JCT Major Project Construction Contract (MP)
- Legal issues and management
Publisher History
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.