Document Status
Withdrawn
Supplement
Core Supplement
Series
JCT Management Building Contract (MC)
Abstract
Appropriate for large-scale projects requiring an early start onsite, where the works are designed by or on behalf of the employer but where it is not possible to prepare full design information before the works commence and where much of the detail design may be of a sophisticated or innovative nature requiring specialists. Also applies where the employer is to provide the management contractor with drawings and a specification, and where a management contractor is to administer the conditions.
History
The current version of this contract is MC 2016. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. Replaces - MC 05. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT management building contract 2011 (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
ISBN
9780414047273
Subjects
- JCT Contracts
- Legal issues and management
- JCT Management Building Contract (MC)
- Contracts
Publisher History
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.