Current
Civil & Structural Supplement
Publication
Illustrates worked examples of the initial and detailed design aspects of composite highway bridge construction using reinforced concrete slab on top of steel girders. Calculations are generally in accordance with the recommendations of BS 5400, in particular BS 5400-3:2000. The three sets of calculations presented are: - 20m span continuous bridge that is designed on the basis of compact sections. - three span haunched bridge that is designed on the basis of non-compact sections. - design of a deck slab. The examples are given in the form of calculation sheets with facing commentary pages. All the examples are updated versions of those previously given in publications P065, P066 and P084.
Iles, D. C.
Supersedes P065, P066 and P084. Companion publication to P289.
9781859421185
With over 30 years experience, the Steel Construction Institute provide technical expertise and best practice to the steel construction sector.
NBS has produced specification systems and information products for construction industry professionals for more than 40 years. The National Building Specification is the recognised UK national standard and is used by over 5,000 organisations. NBS is part of RIBA Enterprises Ltd.
We connect trusted knowledge to customers' workflows – mitigating risk, increasing efficiency and accelerating innovation For more than 60 years, leading R&D and engineering-intensive organizations have relied on us to achieve on-time, on-budget delivery of complex projects and new products. We deliver an unparalleled combination of technical content and Artificial Intelligence (AI) technologies to surface answers from the vast universe of technical knowledge, both inside and outside the organization. In a single interface, we connect the dots between information scattered across many different sources, allowing technical professionals to make better, more informed decisions faster.